Certification of factory production control for structural components (SIST EN 1090-1)

amborzr

mag. Ambrož Rožman

+386 (0)7 49 12 419
+386 (0)41 215 267

This email address is being protected from spambots. You need JavaScript enabled to view it.
This email address is being protected from spambots. You need JavaScript enabled to view it.

alesw

Andrej Weiss

+386 (0)7 49 12 439
+386 (0) 31 719 834

This email address is being protected from spambots. You need JavaScript enabled to view it.
This email address is being protected from spambots. You need JavaScript enabled to view it.

The area covering the production of structural components is facing many changes. The producers of all steel and aluminium structures will have to establish a certified factory production control compliant with the Construction Products Act; further, the presumption of conformity with the harmonized SIST EN 1090-1 standard must be proved.

Initially it was anticipated that each producer will have to establish a certified factory production control by July 1st, 2012. However, the deadline has been extended by another two years. Therefore, the final deadline is July 1st, 2014, but it may be shorter, should that be required by a customer.

What is certification procedure like?

Interview and order

Application for certification

Assessment

Evaluation and decision

Issuance of certificates

Supervision and recertification